Shiel'ds Industrial Structures
shield-temporary-industrial-buildings
Shield Temporary Buildings
shield_mobile_slide

Planning & Permissions for Shield Temporary Structures

Shield Temporary Structures can provide technical drawings if required to help towards any planning permission required. This will depend on your council.

As the law stands, a temporary building can be erected for up to 28 days without the need for planning permission.

However, as the aluminium frame is classified as ‘demountable’, it means that a lot of the structures are installed for a lot longer and can be dismantled easily. It is worth noting that there is no need for foundations, stressing to the relevant councils its of a temporary nature.

Shield Temporary Structures can supply you with structural calculations, method statements and risk assessments should these be requested.

Any questions in regards to planning & permissions for temporary structures please contact your local council.

Need a temporary structure?

Send Us An Enquiry Today

Email : sales@shieldmfg.co.uk